PRIMAVERA P6 PROFESSIONAL FUNDAMENTAL

Training Syllabus:
PRIMAVERA P6 PROFESSIONAL FUNDAMENTAL

TRAINING DESCRIPTION:
Primavera Systems is a brand name under which a range of software packages that collectively form a comprehensive enterprise project portfolio management (EPPM) solution are marketed. Primavera was launched in 1983 by Primavera Systems Inc. and was acquired by Oracle Corporation in 2008.
Primavera P6 EPPM (Enterprise Portfolio Project Management)
Oracle launched two products callled Primavera P6 i.e. P6 EPPM (Enterprise Portfolio Project Management) and P6 Professional. The focus of Primavera EPPM software is to allow organizations to effectively manage their programs and projects – regardless of complexity. The software provides end-to-end, real-time visibility of all corporate information to inform portfolio management decisions, determine the correct resources, and ensure that individual project teams have the appropriate skills to complete any given project.
Primavera P6 Professional
Primavera P6 Professional is a Windows client project scheduling application that is installed on a user’s workstation. Much like any other Windows application, it is run from an executable file that resides on the workstation machine.
P6 Professional can be used as a standalone application accessing a locally installed database such as Oracle XE or Microsoft SQL Server Express. It can also access a central database and be used as a multi-user system when data needs to be shared with others.
P6 Professional is typically used in such industries as, Engineering, Construction, Aerospace, Defense, Utilities, Oil and Gas. P6 Professional is the preferred tool for power users such as schedulers and project managers in industries where detailed, fast, accurate scheduling and critical path method are vital elements for project planning, execution and success.
This training leads participants to use Primavera P6 Professional (Primavera’s Windows-based) through the entire project life cycle, from planning to execution. Topics include adding activities, assigning res sources, and creating a baseline. Participants also gain a thorough background in the concepts of planning and scheduling. It is appropriate for those using P6 Professional either as a stand-alone application or as part of P6 EPPM.
All workshops and instruction stress the three basic elements of project management: schedule, re- sources, and costs. At the end of each day, students apply the con- cepts and functionality they learned in a case study. The course is divided into three sections: Creating a Project; Scheduling the Project; Project Execution and Control.
During the 3-day training our trainer will guide participants how to use Primavera P6 Professional using Hands on Approach and in user friendly environment.

WHO SHOULD ATTEND THIS TRAINING?:
This training is specially designed for
 Functional Implementer
 Business Analysts
 End Users
 Project Manager
 Project Team
But it could be attended by those with engineering graduates background or other disciplines having basic knowledge on implementation of construction project in small/middle, or large scale.

TRAINING OBJECTIVES:
After completing this training the participants should be able to:
• Understand data structures
• Create a project
• Create a Work Breakdown Struc- ture
• Add activities
• View calendars
• Create relationships
• Schedule the project
• Assign constraints
• Format schedule data
• Define roles and resources
• Assign roles
• Assign resources
• Analyze resources
• Optimize the project plan
• Execute the project
• Create reports

TRAINING BENEFITS:
• All participants will get PRIMAVERA P6 PROFESSIONAL & PM TOOLKIT consisting of Learning Material, References, Process and Templates, Samples of Case Study for Projects/IT Projects
• Experienced and Internationally Certificied Trainer will guide participants in Case Study Session using Hands-on Approach
• Getting the skills of using Primavera P6 Professional Fundamental under guidance of experienced and skillfull trainer

TRAINING MATERIAL OUTLINE:
DAY 1
1. Understanding P6 Data
• Describing Enterprise and Project-Specific data
• Logging In
• Opening an Existing Project
• Opening and Customizing Layouts
2. Enterprise Project Structure
• Describing Components of EPS
3. Creating a Project
• Create a project
• Navigating in the Projects Window
• Viewing Project Details
4. Creating a Work Breakdown Structure
• Defining a Work Breakdown Struc- ture
• Creating the WBS Hierarchy
5. Adding Activities
• Describing an Activity and its Compo- nents
• Describing Activity Types
• Adding Activities
• Adding a Notebook Topic
• Adding Steps to an Activity
• Assigning Activity Codes
6. Creating Relationships
• Viewing a Network Logic Diagram
• Relationship Types
• Creating Relationships
7. Exercises & Practices
8. Discussion
DAY 2:
9. Scheduling
• Performing a Forward and Back- ward Pass
• Describing Float
10. Assigning Constraints
• Applying an Overall Deadline to a Project
• Apply a Constraint to an Activity
11. Using Reflection Projects
• Creating a Reflection Project
• Merging Changes
12. Formatting Schedule Data
• Grouping Activities
• Sorting
• Filtering
13. Roles and Resources
• Describing Roles and Resources
• Viewing Dictionaries
14. Assigning Roles
• Assigning Roles to an Activity
• Assign Rates on Roles
15. Exercises & Practices
16. Discussion
DAY 3:
17. Assigning Resources
• Assigning Resources
• Adjusting Budgeted Units/Time
18. Analyzing Resources
• Displaying the Resource Usage Pro- file
19. Optimizing the Project Plan
• Analyzing Schedule Dates
• Shortening a Project Schedule
• Analyzing Resource Availability
20. Baselining the Project Plan
• Creating a Baseline Plan
• Display Baseline Bars on the Gantt Chart
21. Project Execution and Control
• Describing Methods for Updating the Schedule
• Using Progress Spotlight
• Statusing Activities
• Rescheduling the Project
22. Reporting Performance
• Describing Reporting Methods
• Running a Schedule Report
• Creating a report with the Report Wizard
23. Exercises & Practices
24. Discussion

RECOMMENDATION TO PARTICIPANTS :
All participants are recommended to bring notebook/laptop for software installation and practice session

VENUE : Jakarta (Maxone Hotel Menteng, Balairung Hotel Matraman, Sentral Hotel, Haris Tebet, Gd Muamalat Institute, Ibis Manggadua, Little Amaroossa Residence, Cosmo Amaroossa, Zodiak MT. Haryono, Grand Tjokro)

TRAINING DURATION : 3 days

TRAINING TIME :

Januari 2024Februari 2024Maret 2024April 2024
3 – 5 Januari 20245 – 7 Februari 20244 – 6 Maret 20241 – 3 April 2024
8 – 10 Januari 202412 – 14 Februari 202412 – 14 Maret 202422 – 24 April 2024
15 – 17 Januari 202419 – 21 Februari 202418 – 20 Maret 202429 April – 1 Mei 2024
22 – 24 Januari 202426 – 28 Februari 202425 – 27 Maret 2024
29 – 31 Januari 2024
Mei 2024Juni 2024Juli 2024Agustus 2024
6 – 8 Mei 20243 – 5 Juni 20241 – 3 Juli 20245 – 7 Agustus 2024
13 – 15 Mei 202410 – 12 Juni 20248 – 10 Juli 202412 – 14 Agustus 2024
20 – 22 Mei 202419 – 21 Juni 202415 – 17 Juli 202419 – 21 Agustus 2024
27 – 29 Mei 202424 – 26 Juni 202422 – 24 Juli 202426 – 28 Agustus 2024
29 – 31 Juli 2024
September 2024Oktober 2024November 2024Desember 2024
2 – 4 September 20241 – 3 Oktober 20244 – 6 November 20242 – 4 Desember 2024
9 – 11 September 20247 – 9 Oktober 202411 – 13 November 20249 – 11 Desember 2024
16 – 18 September 202414 – 16 Oktober 202418 – 20 November 202416 – 18 Desember 2024
23 – 25 September 202421 – 23 Oktober 202425 – 27 November 202426 – 28 Desember 2024
28 – 30 Oktober 2024

INVESTMENT/PERSON :
1. Rp. 6.500.000/person (full fare) or
2. Rp. 6.250.000/person (early bird, payment 1 week before training) or
3. Rp. 5.950.000/person (if there are 3 persons or more from the same company)

FACILITIES FOR PARTICIPANTS:
1. Training Module
2. Flash Disk contains training material
3. Certificate
4. Stationeries: NoteBook and Ballpoint
5. T-Shirt
6. Backpack
7. Training Photo
8. Training room with Full AC facilities and multimedia
9. Lunch and twice coffeebreak every day of training
10. Qualified Instructor