OPERATION, MAINTENANCE AND TROUBLESHOOTING OF GAS TURBINE

Training Syllabus :
OPERATION, MAINTENANCE AND TROUBLESHOOTING OF GAS TURBINE

PENDAHULUAN:
A gas turbine extracts energy from a flow of hot gas produced by combustion of gas or fuel oil in a stream of compressed air. It has an upstream air compressor (radial or axial flow) mechanically coupled to a downstream turbine and a combustion chamber in between. “Gas turbine” may also refer to just the turbine element. Energy is released when compressed air is mixed with fuel and ignited in the combustor. The resulting gases are directed over the turbine’s blades, spinning the turbine, and mechanically powering the compressor. Finally, the gases are passed through a nozzle, generating additional thrust by accelerating the hot exhaust gases by expansion back to atmospheric pressure. Energy is extracted in the form of shaft power, compressed air and thrust, in any combination, and used to power aircraft, trains, ships, electrical generators, and even tanks. To support the sufficient production system, we need tough worker or increase the worker skill of operation, maintenance, and trouble shooting of gas turbine profession.

WHO SHOULD ATTEND THIS TRAINING?:
Practitioner in the operator level, supervisor level or planner of machine maintenance technology at engineering industry, which at least senior high school or technical vocational school.

TRAINING OBJECTIVE :
1. To able to know to operation, maintenance, and trouble shooting of gas turbine.

TRAINING MATERIAL OUTLINE :
1. Overview of Gas Turbine Technology and Applications
Simple cycle Gas Turbines; cycle considerations; applications; fuels and corrosion; emissions; combined cycle and cogeneration. Overview of Developments
High temperature turbines, reheat turbines, close cycles, and other developments.
2. Rotating Components and Matching
Brief overview of compressor and turbine design; component characteristics and matching. Compressor surge and prevention.
3. Vibration and Rotor Dynamics
A review of vibration will include specific problems such as Blade Vibration and Shaft Critical Speeds. Case histories will link vibration with the fatigue failure of components. Rotor instability, in its various forms, will be discussed. Vibration spectrum analysis will be utilised for the solution of resonance, instability, and gear and blade problems. Campbell (Spoke) diagrams and Critical Speed maps will be derived and used for the solution of vibration and Rotor Dynamic problems. The design and performance of Squeeze-Film Damper Bearings for overcoming many of the problems associated with machine unbalance and critical speeds, will be covered.
4. Combustors and Fuels
A description of combustor types, chamber design, fuel atomisation, ignition and combustor arrangements will be presented. Also discussed will be the constraints imposed by fuels on the design and operation of the hardware. The wide spectrum of fuels, both gaseous and liquid, is examined. An overview of fuel treatment and additives will be made.
5. Performance Analysis
Basic thermodynamic aspects of stationary Gas Turbines. Design and off-design operation. Influence of site effects on typical performance maps. Variable geometry compressor and turbine status.
6. Performance Analysis for Problem Detection
The fundamental concepts of performance analysis as a tool for saving energy costs are discussed. Basic and applied thermodynamics will be reviewed for gas turbines. The use of performance data to pinpoint problem areas will be discussed. Diagnostics related to fouling, nozzle erosion, bowing surge, choke, etc. will be covered. Meaningful trending methods will also be discussed.
7. Gas Path Analysis for Stationary Gas Turbines – Status
Simulation of degraded Gas Turbines, derivation and application of fault coefficient matrix, fault trees and other techniques. Implications for component life and emissions.
8. Gas Turbine Fouling
The causes, effects and detection of fouling in axial compressors will be covered including aero thermodynamic effects, effects on surge margin, intake distortion and blading problems. Filtration and control techniques will be covered.
9. Gas Turbine Repair
The techniques of inspection and repair of gas turbines are described in detail, including NDT techniques, cleaning, plating, heat treatment, welding, etc.
10. Maintenance
Case histories of various types of failures and maintenance problems of onshore and offshore gas turbine compressor installations are discussed. Maintenance techniques using bore scope and spectrum analysis including acoustic monitoring are discussed. Techniques for checking and conducting repairs on impellers, diffusers, bearings, couplings, and foundation repair are emphasised.
11. Special Considerations for CHP Gas Turbines
This section will cover special considerations in design, operation and maintenance of turbines and associated equipment on Cogeneration Services. Several cases will be covered. Off design operation effects on HRSG, STTG Cycles and evaporate cooling will be covered.

VENUE : Kagum Group Hotel Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll

TRAINING DURATION : 4 days

TRAINING TIME :

Januari 2025Februari 2025Maret 2025April 2025
6 - 9 Januari 20253 - 6 Februari 20253 - 6 Maret 20257 - 10 April 2025
13 - 16 Januari 202510 - 13 Februari 202510 - 13 Maret 202514 - 17 April 2025
20 - 23 Januari 202517 - 20 Februari 202517 - 20 Maret 202521 - 24 April 2025
27 - 30 Januari 202524 - 27 Februari 2025 28 Apr - 2 Mei 2025
    
Mei 2025Juni 2025Juli 2025Agustus 2025
5 - 8 Mei 20252 - 5 Juni 20251 - 4 Juli 20254 - 7 Agustus 2025
12 - 15 Mei 20259 - 12 Juni 20257 - 10 Juli 202511 - 14 Agustus 2025
19 - 22 Mei 202516 - 19 Juni 202514 - 17 Juli 202518 - 21 Agustus 2025
26 - 29 Mei 202523 - 26 Juni 202521 - 24 Juli 202525 - 28 Agustus 2025
  28 - 31 Juli 2025 
    
September 2025Oktober 2025November 2025Desember 2025
1 - 4 September 20256 - 9 Oktober 20253 - 6 November 20251 - 4 Desember 2025
8 - 11 September 202513 - 16 Oktober 202510 - 13 November 20258 - 11 Desember 2025
15 - 18 September 202520 - 23 Oktober 202517 - 20 November 202515 - 18 Desember 2025
22 - 25 September 202527 - 30 Oktober 202524 - 27 November 202522 - 25 Desember 2025
29 Sep - 2 Okt 2025   

INVESTMENT PRICE/PERSON :
1. Rp. 8.500.000/person (full fare) or
2. Rp. 8.250.000/person (early bird, payment 1 week before training) or
3. Rp. 7.950.000/person (if there are 3 persons or more from the same company)

FACILITIES FOR PARTICIPANTS:
1. Modul Training
2. Flashdisk Training berisi materi training
3. Sertifikat
4. ATK: NoteBook dan Ballpoint
5. T-Shirt
6. Ransel
7. Foto Training
8. Ruang Training dengan fasilitas Full AC dan multimedia
9. Makan siang dan 2 kali coffeebreak
10. Instruktur yang Qualified