CONTROL VALVE: OPERATION, MAINTENANCE, AND TROUBLESHOOTING

Training Syllabus:
CONTROL VALVE: OPERATION, MAINTENANCE, AND TROUBLESHOOTING

BACKGROUND:
To reduce the effect of these load disturbances, sensors and transmitters collect information about the process variable and its relationship to some desired set point. A controller then processes this information and decides what must be done to get the process variable back to where it should be after a load disturbance occurs. When all the measuring, comparing, and calculating are done, some type of final control element must implement the strategy selected by the controller. The most common final control element in the process control industries is the control valve. The control valve manipulates a flowing fluid, such as gas, steam, water, or chemical compounds, to compensate for the load disturbance and keep the regulated process variable as close as possible to the desired set point. Many people who talk about control valves or valves are really referring to a control valve assembly. The control valve assembly typically consists of the valve body, the internal trim parts, an actuator to provide the motive power to operate the valve, and a variety of additional valve accessories, which can include positioners, transducers, supply pressure regulators, manual operators, snubbers, or limit switches. Whether it is called a valve, control valve or a control valve assembly is not as important as recognizing that the control valve is a critical part of the control loop. It is not accurate to say that the control valve is the most important part of the loop. It is useful to think of a control loop as an instrumentation chain. Like any other chain, the whole chain is only as good as its weakest link. It is important to ensure that the control valve is not the weakest link. Following are definitions for process control, sliding-stem control valve, rotary-shaft control valve, and other control valve functions and characteristics terminology.

OBJECTIVE:
1. To able know to introduction to control valves
2. To able know to control valve performance
3. To able know to valve and actuator types
4. To able know to control valve accessories
5. To able know to control valve selection
6. To able know to special control valves
7. To able know to installation and maintenance

TRAINING MATERIAL OUTLINE:
1. Introduction to Control Valves: What Is A Control Valve?, Process Control Terminology, Sliding-Stem Control Valve Terminology, Rotary-Shaft Control Valve Terminology, Control Valve Functions and Characteristics Terminology.
2. Control Valve Performance: Dead Band, Actuator-Positioner Design, Valve Response Time, Valve Type And Characterization, Valve Sizing.
3. Valve and Actuator Types: Control Valves, Control Valve End Connections, Valve Body Bonnets, Control Valve Packing, Characterization of Cage-Guided Valve Bodies, Valve Plug Guiding, Restricted-Capacity Control Valve Trim, Actuators.
4. Control Valve Accessories: Positioners, Other Control Valve Accessories
5. Control Valve Selection: Valve Body Material, Designations for the High Nickel alloys, Pressure-Temperature Ratings for Standard Class, Face-to-Face Dimensions, Control Valve Seat Leakage Classifications, Control Valve Flow Characteristics, Valve Sizing, Non-Destructive Test Procedures, Cavitation and Flashing
6. Special Control Valves: High Capacity Control Valves, Low Flow Control Valves, High-Temperature Control Valves, Cryogenic Service Valves, Customized Characteristics and Noise Abatement Trims, Valves Subject to Sulfide Stress Cracking
7. Installation and Maintenance: Proper Storage and Protection, Proper Installation Techniques, Control Valve Maintenance, Actuator Diaphragm, Stem Packing, Seat Rings, Bench Set.

VENUE : Kagum Group Hotel Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll

TRAINING DURATION : 4 days

TRAINING TIME :

Januari 2025Februari 2025Maret 2025April 2025
6 - 9 Januari 20253 - 6 Februari 20253 - 6 Maret 20257 - 10 April 2025
13 - 16 Januari 202510 - 13 Februari 202510 - 13 Maret 202514 - 17 April 2025
20 - 23 Januari 202517 - 20 Februari 202517 - 20 Maret 202521 - 24 April 2025
27 - 30 Januari 202524 - 27 Februari 2025 28 Apr - 2 Mei 2025
    
Mei 2025Juni 2025Juli 2025Agustus 2025
5 - 8 Mei 20252 - 5 Juni 20251 - 4 Juli 20254 - 7 Agustus 2025
12 - 15 Mei 20259 - 12 Juni 20257 - 10 Juli 202511 - 14 Agustus 2025
19 - 22 Mei 202516 - 19 Juni 202514 - 17 Juli 202518 - 21 Agustus 2025
26 - 29 Mei 202523 - 26 Juni 202521 - 24 Juli 202525 - 28 Agustus 2025
  28 - 31 Juli 2025 
    
September 2025Oktober 2025November 2025Desember 2025
1 - 4 September 20256 - 9 Oktober 20253 - 6 November 20251 - 4 Desember 2025
8 - 11 September 202513 - 16 Oktober 202510 - 13 November 20258 - 11 Desember 2025
15 - 18 September 202520 - 23 Oktober 202517 - 20 November 202515 - 18 Desember 2025
22 - 25 September 202527 - 30 Oktober 202524 - 27 November 202522 - 25 Desember 2025
29 Sep - 2 Okt 2025   

INVESTMENT PRICE/PERSON :
1. Rp. 8.500.000/person (full fare) or
2. Rp. 8.250.000/person (early bird, payment 1 week before training) or
3. Rp. 7.950.000/person (if there are 3 persons or more from the same company)

FACILITIES FOR PARTICIPANTS:
1. Training Module
2. Flash Disk contains training material
3. Certificate
4. Stationeries: NoteBook and Ballpoint
5. T-Shirt
6. Backpack
7. Training Photo
8. Training room with full AC facilities and multimedia
9. Lunch and twice coffeebreak everyday of training
10. Qualified instructor