DEEPWATER DRILLING RIGS, EQUIPMENT AND OPERATIONS

Training Syllabus:
DEEPWATER DRILLING RIGS, EQUIPMENT AND OPERATIONS

ABOUT THE COURSE
This intensive training course will cover the general technology of a range of offshore drilling rigs from jack-ups to latest semisubmersibles and drill ships. In particular it covers general arrangement, operational capability, mooring and station keeping of these offshore drilling rigs and associated equipment and machineries at sub-sea and topside required to drill and complete wells at shallow to deepwater. Numerous work examples and case studies are presented throughout the course to provide the participants with a broad understanding of the mechanics, maintenance and operation of modern offshore drilling rigs and supporting structures.

DESIGNED FOR
This course is intended for foremen, tool pushers, drilling engineers and supervisors who are involved in contracting, operating and maintenance of offshore drilling rigs and associated equipment.

YOU WILL LEARN
Participants will learn:
1. Operating principles of rotary drilling equipment and auxiliaries.
2. Selection and evaluation of topside rigs and equipment.
3. Transportation, installation and operation of offshore drilling rigs.
4. Contracting and negotiating of drilling rig hire.

TRAINING MATERIAL OUTLINE
1. Offshore Drilling Rigs and Supports Structures:
General arrangement, operational capability and drilling equipment facilities on typical fixed platforms, jackups, barges, drillships and semi-submersibles; operating and standby or survival condition for mobile platforms; mooring procedure and station keeping for semisubmersible and drill ships. In particular the course entails the following:
a. Jack-up rigs: background, jacking mechanism, spud cans, moveable cantilever, drill derrick and several examples of jackup drilling rigs including general layout and storage capacity and rig regulations.
b. Semisubmersible drilling rigs: background, vessel details and semisubmersible examples including general layout for equipment and storages, vessel motions and motion compensation devices and rig regulations.
c. Drill ships: background, vessel details and drill ship examples including general layout for equipment and storages, vessel motions and motion compensation devices and rig regulations.
d. Position and station keeping for floating drilling rigs:
• Mooring: mooring requirements, mooring regulations for drilling vessels, mooring system design, setting and moving the mooring pattern.
• Dynamic positioning: background, dynamic position concept, basic feedback and control, position measurement, thrusters and dynamic position rig design.
• Drilling rigs with twin drilling: design of twin drilling derricks for semis and drillships, working principles, operational capabilities in relation to drilling and equipment and casings Stack up and operational advantages.
• Offshore drilling components: drilling template, temporary and permanent guide bases, guide wire and guide line less systems, subsea wellheads including subsea BOPs, marine riser, LRP, motion compensation and drilling control system.
e. Drilling requirements for platforms and production hosts (Spars and TLPs):
general requirements, drilling guides and templates, well Control and well completion.
f. Subsea wells related safety requirements: requirements for subsea drilling, typical subsea drilling and casing programme, problems associated with rig movements, safety requirements and review of past incidents involving loss of lives.
g. Subsea BOP hook-up and testing operations: Integral components and operating principles of different subsea BOP equipment and choke line manifolds, hook up and testing of BOP equipment.
2. Topside Rig Structure and Associated Rotary Drilling Equipment
The course will provide in depth knowledge on general arrangement, operational principles capabilities, selection and evaluation of drilling masts and associated structures as well as equipment required for drilling from jackups, semisubmersibles and drill ships, in particular it entails the following:
a. Rig powering and transmission system: Calculation of overall power requirement (life support system, rotary equipment, hoisting equipment, fluid circulation and solid separation and other non-drilling activities), rating of internal combustion engine, drive system and utilisation of power, DC-Engine-Generator System and AC-SCR system.
b. Hoisting system: Design consideration and operational requirement for offshore and land based derricks, substructures and portable masts, transportation and assembly of derricks and sub structures, design and operation of block and tackle and drawworks, design consideration and operation limit of different types of ropes, ton-mile calculation and slip and cut program for ropes and calculation of hoisting power requiments.
c. Rotating system:, Calculation of power requirement for rotary table and top drive system for different operational requirement, design consideration for different types of rotary tables and top drive systems and functional and operational limitation of top drive system.
d. Pipe handling system: Operational principles and capabilities of power tons and automated pip handling on offshore drilling rigs.
e. Drillstring design and specifications: API classification of drill pipes and drill collars, manufacturing process of drill pipes, heavy weights, collars and stabilisers, design bottomhole assembly (selection of a combination of drill pipe heavy weight, drill collars and stabilisers) for different drilling depths and conditions based on stress analysis.
f. Drilling fluid circulating system: Operating principles of triplex and duplex pumps, calculation of flow capacities and hydraulic horsepower, sizing of mud pits/mud tanks, mud mixing equipment, solid separation equipment; operating principles and sizing (determining mud handling capacities and horsepower) of shale shaker, desander, desilter, centrifuge etc.); sizing and selection of auxiliary pumps (flow rates and horse powers) and equipment.
3. Environmental Issues Related to Offshore Drilling:
Environmental requirements offshore drilling, environmental impact assessments, use and discharge of drilling muds and fluids and cleaning and disposal of drill cuttings.
4. Preparation of Contract (drilling rigs), Negotiation and Implementation:
Classification, analysis and evaluation of drilling contracts; detailed development of the drilling job, selecting drilling rig equipment capability, development of the contract and the presentation and adjustment of each party’s own position; management system of supervising and implementation of drilling contracts; and dispute case resolution by international law.

VENUE : Kagum Group Hotel Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll

TRAINING DURATION : 3 days

TRAINING TIME :

Januari 2025Februari 2025Maret 2025April 2025
2 - 4 Januari 20253 - 5 Februari 20253 - 5 Maret 20257 - 9 April 2025
6 - 8 Januari 202510 - 12 Februari 202510 - 12 Maret 202514 - 16 April 2025
13 - 15 Januari 202517 - 19 Februari 202517 - 19 Maret 202521 - 23 April 2025
20 - 22 Januari 202524 - 26 Februari 2025 28 - 30 April 2025
27 - 29 Januari 2025   
    
Mei 2025Juni 2025Juli 2025Agustus 2025
5 - 7 Mei 20252 - 4 Juni 20251 - 3 Juli 20254 - 6 Agustus 2025
12 - 14 Mei 20259 - 11 Juni 20257 - 9 Juli 202511 - 13 Agustus 2025
19 - 21 Mei 202516 - 18 Juni 202514 - 16 Juli 202518 - 20 Agustus 2025
26 - 28 Mei 202523 - 25 Juni 202521 - 23 Juli 202525 - 27 Agustus 2025
  28 - 30 Juli 2025 
    
September 2025Oktober 2025November 2025Desember 2025
1 - 3 September 20256 - 8 Oktober 20253 - 5 November 20251 - 3 Desember 2025
8 - 10 September 202513 - 15 Oktober 202510 - 12 November 20258 - 10 Desember 2025
15 - 17 September 202520 - 22 Oktober 202517 - 19 November 202515 - 17 Desember 2025
22 - 24 September 202527 - 29 Oktober 202524 - 26 November 202522 - 24 Desember 2025
29 Sep - 1 Okt 2025  29 - 31 Desember 2025

INVESTMENT PRICE/PERSON :
1. Rp. 7.950.000/person (full fare) or
2. Rp. 7.750.000/person (early bird, payment 1 week before training) or
3. Rp. 7.500.000/person (if there are 3 persons or more from the same company)

FACILITIES FOR PARTICIPANTS:
1. Training Module
2. Flash Disk contains training material
3. Certificate
4. Stationeries: NoteBook and Ballpoint
5. T-Shirt
6. Backpack
7. Training Photo
8. Training room with Full AC facilities and multimedia
9. Lunch and twice coffeebreak every day of training
10. Qualified Instructor