GAS TURBINE OPERATION, MAINTENACE & CONTROL SYSTEM

Training Syllabus:

GAS TURBINE OPERATION, MAINTENACE & CONTROL SYSTEM

 

INTRODUCTION

Production continuity is a keyword in any production process activities, in which power system plays important role to enrgize all of the operation. Gas turbine is known for its high power and high efficiency power generator with low volume engine. Its high energy, high speed rotation, etc., will become advantage if it’s operated and maintained properly. Gas turbine principle and performance however should be understood by operator and any person who get involved with them to increase performance of the operation, maintenance, safety, etc. moreover, since the condition of turbine operation is controlled and monitored by instrumentation, it is also important to understand principles of instrumentation used in turbine operation and condition monitoring.

 

OUTCOME

In this training, gas turbine generator will be discussed from principle, application, components, instrumentation  and its condition monitoring for the prdictive maintenance. Moreover, failure phenomena such as surge, stall, stonewall and their control system to improve safety will also be introduced. After completion of this training participant will understand about the basic principle, application and control system that will help them for improving problem solving on operation and maintenance activities.

 

TRAINING MATERIAL OUTLINE

  1. Engineering Design
  2. Basics Operating Principles
  3. Implementation and selection
  4. Energy conversion
  5. Preventive, predictive and Pro-active Maintenance
  6. Turbine Components
  7. Engine Case – Air Inlet
  8. Compressor Section
  9. Diffuser & Combustion
  10. Turbine & Exhaust
  11. Turbine control and monitoring system
  12. Sensors and measurement system
  • Mesurement principles
  • Automation and control system
  • Vibration
  • Proximity
  • Signal conditioning
  1. Vibration monitoring and signal analysis
  2. Surging, stall, and stonewall

 

WHO SHOULD ATTEND?

The training can be important for all personnel involved with the design, installation, maintenance, operation and servicing of gas turbine generator and their basic systems.

 

VENUE : Yogyakarta (Ibis Styles Hotel/ Ibis Malioboro Hotel/ Jambuluwuk Hotel/ Cavinton Hotel/ Grand Zuri Hotel, dll)

TRAINING DURATION :    4 days

TRAINING TIME :

Januari 2026Februari 2026Maret 2026April 2026
5 - 8 Januari 20262 - 5 Februari 20262 - 5 Maret 20266 - 9 April 2026
12 - 15 Januari 20269 - 12 Februari 20269 - 12 Maret 202613 - 16 April 2026
19 - 22 Januari 202618 - 21 Februari 202625 - 28 Maret 202620 - 23 April 2026
26 - 29 Januari 202623 - 26 Februari 202630 Mar – 2 Apr 202627 - 30 April 2026
    
Mei 2026Juni 2026Juli 2026Agustus 2026
4 - 7 Mei 20262 - 5 Juni 20261 - 4 Juli 20263 - 6 Agustus 2026
11 - 14 Mei 20268 - 11 Juni 20266 - 9 Juli 202610 - 13 Agustus 2026
18 - 21 Mei 202617 - 20 Juni 202613 - 16 Juli 202619 - 22 Agustus 2026
 22 - 25 Juni 202620 - 23 Juli 202626 - 29 Agustus 2026
  27 - 30 Juli 2026 
    
September 2026Oktober 2026November 2026Desember 2026
1 - 4 September 20265 - 8 Oktober 20262 - 5 November 20261 - 4 Desember 2026
7 - 10 September 202612 - 15 Oktober 20269 - 12 November 20267 - 10 Desember 2026
14 - 17 September 202619 - 22 Oktober 202616 - 19 November 202614 - 17 Desember 2026
21 - 24 September 202626 - 29 Oktober 202623 - 26 November 202621 - 24 Desember 2026
28 Sept – 1 Okt 2026  28 - 31 Desember 2026

INVESTMENT PRICE/PERSON :

  1. 8.500.000/person (full fare) or
  2. 8.250.000/person (early bird, payment 1 week before training) or
  3. 7.950.000/person (if there are 3 persons or more from the same company)

 

FACILITIES FOR PARTICIPANTS:

  1. Training Module
  2. Flash Disk contains training material
  3. Certificate
  4. Stationeries: NoteBook and Ballpoint
  5. T-Shirt
  6. Backpack
  7. Training Photo
  8. Training room with Full AC facilities and multimedia
  9. Lunch and twice coffeebreak every day of training
  10. Qualified Instructor