GAS TURBINE: OPERATION, MAINTENANCE AND TROUBLESHOOTING

Training Syllabus :
GAS TURBINE: OPERATION, MAINTENANCE AND TROUBLESHOOTING

PENDAHULUAN: :
A gas turbine extracts energy from a flow of hot gas produced by combustion of gas or fuel oil in a stream of compressed air. It has an upstream air compressor (radial or axial flow) mechanically coupled to a downstream turbine and a combustion chamber in between. “Gas turbine” may also refer to just the turbine element. Energy is released when compressed air is mixed with fuel and ignited in the combustor. The resulting gases are directed over the turbine’s blades, spinning the turbine, and mechanically powering the compressor. Finally, the gases are passed through a nozzle, generating additional thrust by accelerating the hot exhaust gases by expansion back to atmospheric pressure. Energy is extracted in the form of shaft power, compressed air and thrust, in any combination, and used to power aircraft, trains, ships, electrical generators, and even tanks. To support the sufficient production system, we need tough worker or increase the worker skill of operation, maintenance, and trouble shooting of gas turbine profession.

WHO SHOULD ATTEND THIS TRAINING?:
Practitioner in the operator level, supervisor level or planner of machine maintenance technology at engineering industry, which at least senior high school or technical vocational school.

TRAINING OBJECTIVE :
1. To able to know to operation, maintenance, and trouble shooting of gas turbine.

TRAINING MATERIAL OUTLINE :
1. Overview of Gas Turbine Technology and Applications
Simple cycle Gas Turbines; cycle considerations; applications; fuels and corrosion; emissions; combined cycle and cogeneration. Overview of Developments
High temperature turbines, reheat turbines, close cycles, and other developments.
2. Rotating Components and Matching
Brief overview of compressor and turbine design; component characteristics and matching. Compressor surge and prevention.
3. Vibration and Rotor Dynamics
A review of vibration will include specific problems such as Blade Vibration and Shaft Critical Speeds. Case histories will link vibration with the fatigue failure of components. Rotor instability, in its various forms, will be discussed. Vibration spectrum analysis will be utilised for the solution of resonance, instability, and gear and blade problems. Campbell (Spoke) diagrams and Critical Speed maps will be derived and used for the solution of vibration and Rotor Dynamic problems. The design and performance of Squeeze-Film Damper Bearings for overcoming many of the problems associated with machine unbalance and critical speeds, will be covered.
4. Combustors and Fuels
A description of combustor types, chamber design, fuel atomisation, ignition and combustor arrangements will be presented. Also discussed will be the constraints imposed by fuels on the design and operation of the hardware. The wide spectrum of fuels, both gaseous and liquid, is examined. An overview of fuel treatment and additives will be made.
5. Performance Analysis
Basic thermodynamic aspects of stationary Gas Turbines. Design and off-design operation. Influence of site effects on typical performance maps. Variable geometry compressor and turbine status.
6. Performance Analysis for Problem Detection
The fundamental concepts of performance analysis as a tool for saving energy costs are discussed. Basic and applied thermodynamics will be reviewed for gas turbines. The use of performance data to pinpoint problem areas will be discussed. Diagnostics related to fouling, nozzle erosion, bowing surge, choke, etc. will be covered. Meaningful trending methods will also be discussed.
7. Gas Path Analysis for Stationary Gas Turbines – Status
Simulation of degraded Gas Turbines, derivation and application of fault coefficient matrix, fault trees and other techniques. Implications for component life and emissions.
8. Gas Turbine Fouling
The causes, effects and detection of fouling in axial compressors will be covered including aero thermodynamic effects, effects on surge margin, intake distortion and blading problems. Filtration and control techniques will be covered.
9. Gas Turbine Repair
The techniques of inspection and repair of gas turbines are described in detail, including NDT techniques, cleaning, plating, heat treatment, welding, etc.
10. Maintenance
Case histories of various types of failures and maintenance problems of onshore and offshore gas turbine compressor installations are discussed. Maintenance techniques using bore scope and spectrum analysis including acoustic monitoring are discussed. Techniques for checking and conducting repairs on impellers, diffusers, bearings, couplings, and foundation repair are emphasised.
11. Special Considerations for CHP Gas Turbines
This section will cover special considerations in design, operation and maintenance of turbines and associated equipment on Cogeneration Services. Several cases will be covered. Off design operation effects on HRSG, STTG Cycles and evaporate cooling will be covered.

VENUE : Kagum Group Hotel Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll

TRAINING DURATION : 4 days

TRAINING TIME :

Januari 2026Februari 2026Maret 2026April 2026
5 - 8 Januari 20262 - 5 Februari 20262 - 5 Maret 20266 - 9 April 2026
12 - 15 Januari 20269 - 12 Februari 20269 - 12 Maret 202613 - 16 April 2026
19 - 22 Januari 202618 - 21 Februari 202625 - 28 Maret 202620 - 23 April 2026
26 - 29 Januari 202623 - 26 Februari 202630 Mar – 2 Apr 202627 - 30 April 2026
    
Mei 2026Juni 2026Juli 2026Agustus 2026
4 - 7 Mei 20262 - 5 Juni 20261 - 4 Juli 20263 - 6 Agustus 2026
11 - 14 Mei 20268 - 11 Juni 20266 - 9 Juli 202610 - 13 Agustus 2026
18 - 21 Mei 202617 - 20 Juni 202613 - 16 Juli 202619 - 22 Agustus 2026
 22 - 25 Juni 202620 - 23 Juli 202626 - 29 Agustus 2026
  27 - 30 Juli 2026 
    
September 2026Oktober 2026November 2026Desember 2026
1 - 4 September 20265 - 8 Oktober 20262 - 5 November 20261 - 4 Desember 2026
7 - 10 September 202612 - 15 Oktober 20269 - 12 November 20267 - 10 Desember 2026
14 - 17 September 202619 - 22 Oktober 202616 - 19 November 202614 - 17 Desember 2026
21 - 24 September 202626 - 29 Oktober 202623 - 26 November 202621 - 24 Desember 2026
28 Sept – 1 Okt 2026  28 - 31 Desember 2026

INVESTMENT PRICE/PERSON :
1. Rp. 8.500.000/person (full fare) or
2. Rp. 8.250.000/person (early bird, payment 1 week before training) or
3. Rp. 7.950.000/person (if there are 3 persons or more from the same company)

FACILITIES FOR PARTICIPANTS:
1. Modul Training
2. Flashdisk Training berisi materi training
3. Sertifikat
4. ATK: NoteBook dan Ballpoint
5. T-Shirt
6. Ransel
7. Foto Training
8. Ruang Training dengan fasilitas Full AC dan multimedia
9. Makan siang dan 2 kali coffeebreak
10. Instruktur yang Qualified