fbpx

HVAC SYSTEM: OPERATION AND MAINTENANCE

Training Syllabus :
HVAC SYSTEM: OPERATION AND MAINTENANCE

INTRODUCTION :
Heating, Ventilation and Air-Conditioning System: Operation and Maintenance, covers the fundamentals and practical applications for understanding air-conditioning systems including the operation and maintenance. The comprehensive coverage of the basic theory, latest terminology, system analysis, optimization concept, and calculation methods to make this the most complete course available today in achieving an economical system. Fundamentals of air-conditioning system give comprehensively understanding air treatment and heat transfer principle in reducing energy cost, besides essential knowledge of fluid mechanics in air conditioning system. Those all play important role on operation and maintenance of air conditioning systems. Participating in this course, you enable to analyze and recommend the most effective solution available in air conditioning system for operation and maintenance, enable to utilize energy as possible as saving due to limited energy resources, and also you are familiar and better understanding of all aspects relate to efficient air-conditioning system in building.

WHO SHOULD ATTEND THIS TRAINING ? :
a. Technicians
b. Mechanical and facility engineers
c. Who responsible for operating and maintaining mechanical equipments for building

TRAINING MATERIAL OUTLINE :
1. Basic Theory of HVAC
a. Basic Concept of HVAC
b. Basics of Heat and Measurement
c. Thermodynamic Properties and Process
d. Psychometrics and Air Treatment
e. Global Issues in Environment
f. Unit and Conversion
2. Refrigeration and Refrigerants
a. Montreal and Kyoto Protocol
b. Refrigerant Types and Naming Rule for Refrigerants
c. Refrigerant Requirements and Desirable Qualities
d. Refrigerant Selection
e. Suitable of Oil and Refrigerant
f. Vapor Compression and Vapor Absorption Cycles
g. Evaporative Cooling and Cooling Tower
h. Storage System
i. Water Systems and Unitary Systems
3. Air Distribution System
a. Unitary and Central System
b. Single-Zone Systems
c. Multiple-Zone Systems
d. Terminal Reheat Systems
e. Dual-Duct or Multi-zone System
f. Pressure Drop in Duct
g. System Balancing
h. Centrifugal Fans and Their Characteristics
i. Air Distribution in Rooms
j. Diffusers and Induction
4. Hydronic System
a. Water and Refrigerant Piping
b. Comparison of Water and Air as Heat-Conveying Media
c. Heat Distribution from Hot-Water System
d. High-Temperature Water Systems
e. Available Pipe and Tubing
f. Pressure Drop in Water Piping Installation
g. Pressure Drop in Refrigerant Piping Installation
h. Pump Characteristic and Selection
5. Basic Automatic Controls
a. Basic Electricity and Magnistism
b. Introduction to Automatic Controls
c. Automatic Control Components and Applications
d. Troubleshooting Basic Control
6. Safety, Tools, and Equipment
a. General Safety Practices
b. Tools and Equipment
c. Fasteners
d. Tubing and Piping
e. Calibration Instrument
f. General Maintenance
7. Leak Detection, Pumping Down and Charging
a. Dye Systems
b. Test Pressures
c. Methods of Testing
d. Bubble Test
e. Halide Torch
f. Electronic Leak Detector
g. System Evacuation
h. Refrigerant Recharging
i. Refrigerant Recovery
j. Recycling and Reclaiming
8. Operating Principles and Symptoms
a. Temperature, Humidity and Air Motion
b. Air Measurement
c. Calculating the Operating Head Pressure
d. Compressor Pressure Ratio
e. Air Handling Unit
f. Fan Coil Unit
g. Filter Check
h. Troubleshooting and Symptoms of System Faults
i. Troubleshooting Refrigeration Systems
j. Troubleshooting Hydronic Systems
k. Troubleshooting Air Distribution Systems
9. Service Diagnosis and Repair
a. Definition of Reparation
b. Replacing a Thermostatic Expansion Valve
c. Replacing the Filter Drier
d. Compressor Efficiency Test
e. Water Cooled Condensers: Scale and Corrosion
f. Compressor Motor Burn-out: System Flushing
g. Pressure Controls
h. Special Duct Problems and Duct Maintenance
i. Special Piping Problems and Hydronic Maintenance

VENUE : Kagum Group Hotel Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll

TRAINING DURATION : 4 days

TRAINING TIME :

Januari 2024Februari 2024Maret 2024April 2024
2 – 5 Januari 20245 – 8 Februari 20244 – 7 Maret 20241 – 4 April 2024
8 – 11 Januari 202412 – 15 Februari 202412 – 15 Maret 202422 – 25 April 2024
15 – 18 Januari 202419 – 22 Februari 202418 – 21 Maret 202429 April – 2 Mei 2024
22 – 25 Januari 202426 – 29 Februari 202425 – 28 Maret 2024
29 Jan – 1 Feb 2024
Mei 2024Juni 2024Juli 2024Agustus 2024
6 – 9 Mei 20243 – 6 Juni 20241 – 4 Juli 20245 – 8 Agustus 2024
13 – 16 Mei 202410 – 13 Juni 20248 – 11 Juli 202412 – 15 Agustus 2024
20 – 23 Mei 202419 – 22 Juni 202415 – 18 Juli 202419 – 22 Agustus 2024
27 – 30 Mei 202424 – 27 Juni 202422 – 25 Juli 202426 – 29 Agustus 2024
29 Juli – 1 Agus 2024
September 2024Oktober 2024November 2024Desember 2024
2 – 5 September 20241 – 4 Oktober 20244 – 7 November 20242 – 5 Desember 2024
9 – 12 September 20247 – 10 Oktober 202411 – 14 November 20249 – 12 Desember 2024
16 – 19 September 202414 – 17 Oktober 202418 – 21 November 202416 – 19 Desember 2024
23 – 26 September 202421 – 24 Oktober 202425 – 28 November 2024
28 – 31 Oktober 2024

INVESTMENT PRICE/PERSON :
1. Rp 8.750.000/person (full fare) or
2. Rp 8.500.000/person (early bird, payment 1 week before training) or
3. Rp 8.250.000/person (if there are 3 or more participants from the same company)

FACILITIES FOR PARTICIPANTS:
1. Training Module
2. Flash Disk contains training material
3. Certificate
4. Stationeries: NoteBook and Ballpoint
5. T-Shirt
6. Backpack
7. Training Photo
8. Training room with full AC facilities and multimedia
9. Lunch and twice coffeebreak everyday of training
10. Qualified instructor