LEAN THINKING IN IMPROVING WORKPLACES PERFORMANCE

Silabus Training :
LEAN THINKING IN IMPROVING WORKPLACES PERFORMANCE

INTRODUCTION :
Lean Thinking is a focus on eliminating waste so that all processes in the total system, process, servicing or production line add value from the Customer Perspective. Lean Thinking is not about:
(1). Staff Cuts;
(2). Assigning Blame, and;
(3). Nominal or One-Time Changes.

There are five principles of lean thinking: Value, Value Stream, Flow, Pull and Perfection.

VALUE is defined as a “capability provided to customer at the right time at an appropriate price, as defined in each case by the customer. Value is the critical starting point for lean thinking and can only be defined by the ultimate end customer.

The VALUE STREAM is defined as the set of all the “specific activities required to design, order, and provide a specific product, from concept to launch, order to delivery, and raw materials into the hands of the customer. To create a value stream, describe what happens to a product at each step in its production, from design to order to raw material to delivery. There are three types of activities in the value stream – one kind adds value, and the other two are “muda” (the Japanese word for waste):
Value-Added: Those activities that unambiguously create value.
Type One Muda: Activities that create no value but seem to be unavoidable with current technologies or production assets.
Type Two Muda: Activities that create no value and are immediately avoidable.

Some examples of muda are mistakes which require rectification, groups of people in a downstream
activity waiting on an upstream activity, or goods which don’t meet the needs of the customer.

The lean principle of FLOW is defined as the progressive achievement of tasks along the value stream so that a product proceeds from design to launch, order to delivery and raw materials into the hands of the customer with no stoppages, scrap or backflows.

The fourth lean principle of PULL is defined as a “system of cascading production and delivery instructions from downstream to upstream in which nothing is produced by the upstream supplier until the downstream customer signals a need.

The fifth and final lean principle is PERFECTION, defined as the “complete elimination of muda so that all activities along a value stream create value. This fifth principle makes the pursuit of lean a never-ending process, as there will always be activities that are considered muda in the value stream and the complete elimination of muda is more of a desired end-state that a truly achievable goal.

CAKUPAN MATERI TRAINING :
1. Basics of LEAN
2. Definition of WASTE
3. Consequences of WASTE.
4. Value-Added & Non-Value Added.
5. Identification of Mr. TIMWOODS
6. Steps in LEAN PROCESS
7. LEAN Tools
8. Value Stream Mapping
9. Key Factors of Successful Lean Implementation

VENUE : Jakarta (Maxone Hotel Menteng, Balairung Hotel Matraman, Sentral Hotel, Haris Tebet, Gd Muamalat Institute, Ibis Manggadua, Little Amaroossa Residence, Cosmo Amaroossa, Zodiak MT. Haryono, Grand Tjokro)

TRAINING DURATION : 2 hari

TRAINING TIME :

Januari 2026Februari 2026Maret 2026April 2026
5 - 6 Januari 20262 - 3 Februari 20262 - 3 Maret 20266 - 7 April 2026
12 - 13 Januari 20269 - 10 Februari 20269 - 10 Maret 202613 - 14 April 2026
19 - 20 Januari 202618 - 19 Februari 202616 - 17 Maret 202620 - 21 April 2026
26 - 27 Januari 202623 - 24 Februari 202626 - 27 Maret 202627 - 28 April 2026
  30 - 31 Maret 2026 
    
Mei 2026Juni 2026Juli 2026Agustus 2026
4 - 5 Mei 20262 - 3 Juni 20266 - 7 Juli 20263 - 4 Agustus 2026
11 - 12 Mei 20268 - 9 Juni 202613 - 14 Juli 202610 - 11 Agustus 2026
18 - 19 Mei 202617 - 18 Juni 202620 - 21 Juli 202619 - 20 Agustus 2026
25 - 26 Mei 202622 - 23 Juni 202627 - 28 Juli 202626 - 27 Agustus 2026
 29 - 30 Juni 2026  
    
September 2026Oktober 2026November 2026Desember 2026
1 - 2 September 20265 - 6 Oktober 20262 - 3 November 20261 - 2 Desember 2026
7 - 8 September 202612 - 13 Oktober 20269 - 10 November 20267 - 8 Desember 2026
14 - 15 September 202619 - 20 Oktober 202616 - 17 November 202614 - 15 Desember 2026
21 - 22 September 202626 - 27 Oktober 202623 - 24 November 202621 - 22 Desember 2026
28 - 29 September 2026  28 - 29 Desember 2026

INVESTMENT PRICE/PERSON :
1. Rp. 4.950.000/person (full fare) or
2. Rp. 4.750.000/person (early bird, payment 1 week before training) or
3. Rp. 4.500.000/person (if there are 3 persons or more from the same company)

FACILITIES FOR PARTICIPANTS :
1. Modul Training
2. Flashdisk Training berisi materi training
3. Sertifikat
4. ATK: NoteBook dan Ballpoint
5. T-Shirt
6. Ransel
7. Foto Training
8. Ruang Training dengan fasilitas Full AC dan multimedia
9. Makan siang dan 2 kali coffeebreak
10. Instruktur yang Qualified