LEAN THINKING IN IMPROVING WORKPLACES PERFORMANCE

Silabus Training :
LEAN THINKING IN IMPROVING WORKPLACES PERFORMANCE

INTRODUCTION :
Lean Thinking is a focus on eliminating waste so that all processes in the total system, process, servicing or production line add value from the Customer Perspective. Lean Thinking is not about:
(1). Staff Cuts;
(2). Assigning Blame, and;
(3). Nominal or One-Time Changes.

There are five principles of lean thinking: Value, Value Stream, Flow, Pull and Perfection.

VALUE is defined as a “capability provided to customer at the right time at an appropriate price, as defined in each case by the customer. Value is the critical starting point for lean thinking and can only be defined by the ultimate end customer.

The VALUE STREAM is defined as the set of all the “specific activities required to design, order, and provide a specific product, from concept to launch, order to delivery, and raw materials into the hands of the customer. To create a value stream, describe what happens to a product at each step in its production, from design to order to raw material to delivery. There are three types of activities in the value stream – one kind adds value, and the other two are “muda” (the Japanese word for waste):
Value-Added: Those activities that unambiguously create value.
Type One Muda: Activities that create no value but seem to be unavoidable with current technologies or production assets.
Type Two Muda: Activities that create no value and are immediately avoidable.

Some examples of muda are mistakes which require rectification, groups of people in a downstream
activity waiting on an upstream activity, or goods which don’t meet the needs of the customer.

The lean principle of FLOW is defined as the progressive achievement of tasks along the value stream so that a product proceeds from design to launch, order to delivery and raw materials into the hands of the customer with no stoppages, scrap or backflows.

The fourth lean principle of PULL is defined as a “system of cascading production and delivery instructions from downstream to upstream in which nothing is produced by the upstream supplier until the downstream customer signals a need.

The fifth and final lean principle is PERFECTION, defined as the “complete elimination of muda so that all activities along a value stream create value. This fifth principle makes the pursuit of lean a never-ending process, as there will always be activities that are considered muda in the value stream and the complete elimination of muda is more of a desired end-state that a truly achievable goal.

CAKUPAN MATERI TRAINING :
1. Basics of LEAN
2. Definition of WASTE
3. Consequences of WASTE.
4. Value-Added & Non-Value Added.
5. Identification of Mr. TIMWOODS
6. Steps in LEAN PROCESS
7. LEAN Tools
8. Value Stream Mapping
9. Key Factors of Successful Lean Implementation

VENUE : Jakarta (Maxone Hotel Menteng, Balairung Hotel Matraman, Sentral Hotel, Haris Tebet, Gd Muamalat Institute, Ibis Manggadua, Little Amaroossa Residence, Cosmo Amaroossa, Zodiak MT. Haryono, Grand Tjokro)

TRAINING DURATION : 2 hari

TRAINING TIME :

Januari 2025Februari 2025Maret 2025April 2025
2 - 3 Januari 20253 - 4 Februari 20253 - 4 Maret 20257 - 8 April 2025
6 - 7 Januari 202510 - 11 Februari 202510 - 11 Maret 202514 - 15 April 2025
13 - 14 Januari 202517 - 18 Februari 202517 - 18 Maret 202521 - 22 April 2025
20 - 21 Januari 202524 - 25 Februari 2025 28 - 29 April 2025
27 - 28 Januari 2025   
    
Mei 2025Juni 2025Juli 2025Agustus 2025
2 - 3 Mei 20252 - 3 Juni 20251 - 2 Juli 20251 - 2 Agustus 2025
5 - 6 Mei 20259 - 10 Juni 20257 - 8 Juli 20254 - 5 Agustus 2025
12 - 13 Mei 202516 - 17 Juni 202514 - 15 Juli 202511 - 12 Agustus 2025
19 - 20 Mei 202523 - 24 Juni 202521 - 22 Juli 202518 - 19 Agustus 2025
26 - 27 Mei 2025 28 - 29 Juli 202525 - 26 Agustus 2025
    
September 2025Oktober 2025November 2025Desember 2025
1 - 2 September 20251 - 2 Oktober 20253 - 4 November 20251 - 2 Desember 2025
8 - 9 September 20256 - 7 Oktober 202510 - 11 November 20258 - 9 Desember 2025
15 - 16 September 202513 - 14 Oktober 202517 - 18 November 202515 - 16 Desember 2025
22 - 23 September 202520 - 21 Oktober 202524 - 25 November 202522 - 23 Desember 2025
29 - 30 September 202527 - 28 Oktober 2025 29 - 30 Desember 2025

INVESTMENT PRICE/PERSON :
1. Rp. 4.950.000/person (full fare) or
2. Rp. 4.750.000/person (early bird, payment 1 week before training) or
3. Rp. 4.500.000/person (if there are 3 persons or more from the same company)

FACILITIES FOR PARTICIPANTS :
1. Modul Training
2. Flashdisk Training berisi materi training
3. Sertifikat
4. ATK: NoteBook dan Ballpoint
5. T-Shirt
6. Ransel
7. Foto Training
8. Ruang Training dengan fasilitas Full AC dan multimedia
9. Makan siang dan 2 kali coffeebreak
10. Instruktur yang Qualified