PREVENTIVE & PREDICTIVE MAINTENANCE (PPM)

Training Syllabus:
PREVENTIVE & PREDICTIVE MAINTENANCE (PPM)

TRAINING OBJECTIVE :
Preventive and predictive maintenance is a maintenance system which very reliable to prevent some sudden troubles or breakdown that may happened on factory’s tools/equipments. The sudden troubles are very potential things that caused a big loss in production process. The effects of this problem are some failure to achieve production target, the lack of personnel, unprepared spare parts, etc. Preventive and predictive maintenance application system starts from standard arranging, activity planning, realization supervising, and, as the finish line is, evaluating and analyzing the maintenance’s result.

WHO SHOULD ATTEND THIS TRAINING?
This special course is designed for manager, supervisor, engineer, planer, foreman, and technician. Also, for those who are in operations, engineering and purchasing division and who would like to acquire an understanding of how the quality of the maintenance function affects their function.

WHAT WILL THE PARTICIPANT GET?
After completing this course, participants will be able to:
1. Develop, implement and supervise the preventive and predictive maintenance program
2. Economize the time, money and company’s resources by using sophisticated technique and method in order to optimize the affectivity of maintenance.
3. Prevent the company’s equipment and tools from damage and make the machine’s living period longer.
4. Decrease the down time
5. Increase the profit

TRAINING MATERIAL OUTLINE :
A. Why Preventive & Predictive Maintenance
1. Apprising maintenance performance and effectiveness
2. Typical maintenance controls
3. Reactive maintenance
4. Anticipative maintenance
5. Ascertainment of equipment condition
6. The need for preventive maintenance
7. Why preventive maintenance
8. Preventive Predictive maintenance objectives
9. Preventive Predictive maintenance prerequisites
10. Preventive maintenance feasibility analysis
11. Policies
12. PM program functions
13. Cost impact
14. Saving potential

B. Developing the Preventive Predictive Maintenance Program
1. Assignment of organizational responsibilities typical maintenance functional assignments operational concepts
2. Equipment to be included
3. Equipment inventory sheet – examples
4. Equipment numbering concepts
5. The PM work order
6. Developing the inspection sheet
7. ECS rating sheet as cross reference
8. Sample of equipment components
9. Spare parts and material needs
10. Inspection sheet examples
11. Determining the frequency cycle
12. Frequency cycle examples
13. Scheduled frequency overview
14. Developing job safety practices – typical examples
15. Considering manual versus computerization
16. Predictive maintenance can determine maintenance requirement
17. Predictive maintenance and its applied techniques as part of the PM program
18. Vibration analysis
19. Wear particle analyzing
20. Thermography

C. IMPLEMENTATION OF PREVENTIVE MAINTENANCE PROGRAM
1. Job planning
2. The planning function
3. Planning, Service to do
4. Job planning prerequisite
5. Planners qualifications
6. Duties and responsibilities of planners
7. The hob package
8. Line supervisors qualifications
9. Planning permits Us, to forecast, communicate and measure
10. What job should be planned
11. Time required to perform work…labor content
12. Standard defined
13. Consistency of estimating
14. Estimating methods
15. Work backlog
16. Scheduling of maintenance work
17. PERT and CPM as scheduling tools
18. Loading of the PM work order
19. Load leveling
20. Weekly scheduling
21. Manpower requirements forecasting
22. Forecasting by crew
23. Forecasting by department
24. Weekly schedule – Computer and manual example
25. Training of personne

D. CONTROLLING THE PREVENTIVE PREDICTIVE MAINTENANCE PROCESS
1. Preventive maintenance administration
2. Planned maintenance
3. Special tools and equipment
4. Service user coordination
5. Equipment availability
6. Service user notification – examples
7. Automotive notification – examples
8. Control reporting
9. What should be included
10. Schedule for supervisor
11. Schedule for supervisor service user
12. Overdue for maintenance and service user
13. Missed PM report for maintenance and service user
14. Complete PM’s
15. Summary report of all PM’s completed
16. Listing of all PM’s set-up in program
17. Planning and scheduling index example
18. Assurance of work performed
19. Conformance and auditing
20. Feedback evaluation/corrective action cycle

E. EXAMINING RESULTS
1. Effectiveness of the preventive maintenance program
2. Refining the PM program
3. 3Correlating preventive maintenance to breakdown maintenance
4. Measuring and appraising the PM program
5. Equipment history
6. Analyzing equipment failures
7. Some relevant maintenance control indices
F. APPLICATION EXERCISE
1. How to organize, develop and implement a successful preventive maintenance program summary
2. Adapting the PM concept at your location
3. Hands-on exercise

VENUE : Kagum Group Hotel Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll

TRAINING DURATION : 4 days

TRAINING TIME :

Januari 2026Februari 2026Maret 2026April 2026
5 - 8 Januari 20262 - 5 Februari 20262 - 5 Maret 20266 - 9 April 2026
12 - 15 Januari 20269 - 12 Februari 20269 - 12 Maret 202613 - 16 April 2026
19 - 22 Januari 202618 - 21 Februari 202625 - 28 Maret 202620 - 23 April 2026
26 - 29 Januari 202623 - 26 Februari 202630 Mar – 2 Apr 202627 - 30 April 2026
    
Mei 2026Juni 2026Juli 2026Agustus 2026
4 - 7 Mei 20262 - 5 Juni 20261 - 4 Juli 20263 - 6 Agustus 2026
11 - 14 Mei 20268 - 11 Juni 20266 - 9 Juli 202610 - 13 Agustus 2026
18 - 21 Mei 202617 - 20 Juni 202613 - 16 Juli 202619 - 22 Agustus 2026
 22 - 25 Juni 202620 - 23 Juli 202626 - 29 Agustus 2026
  27 - 30 Juli 2026 
    
September 2026Oktober 2026November 2026Desember 2026
1 - 4 September 20265 - 8 Oktober 20262 - 5 November 20261 - 4 Desember 2026
7 - 10 September 202612 - 15 Oktober 20269 - 12 November 20267 - 10 Desember 2026
14 - 17 September 202619 - 22 Oktober 202616 - 19 November 202614 - 17 Desember 2026
21 - 24 September 202626 - 29 Oktober 202623 - 26 November 202621 - 24 Desember 2026
28 Sept – 1 Okt 2026  28 - 31 Desember 2026

INVESTMENT PRICE/PERSON :
1. Rp 8.750.000/person (full fare) or
2. Rp 8.500.000/person (early bird, payment 1 week before training) or
3. Rp 8.250.000/person (if there are 3 or more participants from the same company)

FACILITIES FOR PARTICIPANTS :
1. Training Module
2. Flash Disk contains training material
3. Certificate
4. Stationeries: NoteBook and Ballpoint
5. T-Shirt
6. Backpack
7. Training Photo
8. Training room with Full AC facilities and multimedia
9. Lunch and twice coffeebreak every day of training
10. Qualified Instructor