fbpx

PREVENTIVE & PREDICTIVE MAINTENANCE (PPM)

Training Syllabus:
PREVENTIVE & PREDICTIVE MAINTENANCE (PPM)

TRAINING OBJECTIVE :
Preventive and predictive maintenance is a maintenance system which very reliable to prevent some sudden troubles or breakdown that may happened on factory’s tools/equipments. The sudden troubles are very potential things that caused a big loss in production process. The effects of this problem are some failure to achieve production target, the lack of personnel, unprepared spare parts, etc. Preventive and predictive maintenance application system starts from standard arranging, activity planning, realization supervising, and, as the finish line is, evaluating and analyzing the maintenance’s result.

WHO SHOULD ATTEND THIS TRAINING?
This special course is designed for manager, supervisor, engineer, planer, foreman, and technician. Also, for those who are in operations, engineering and purchasing division and who would like to acquire an understanding of how the quality of the maintenance function affects their function.

WHAT WILL THE PARTICIPANT GET?
After completing this course, participants will be able to:
1. Develop, implement and supervise the preventive and predictive maintenance program
2. Economize the time, money and company’s resources by using sophisticated technique and method in order to optimize the affectivity of maintenance.
3. Prevent the company’s equipment and tools from damage and make the machine’s living period longer.
4. Decrease the down time
5. Increase the profit

TRAINING MATERIAL OUTLINE :
A. Why Preventive & Predictive Maintenance
1. Apprising maintenance performance and effectiveness
2. Typical maintenance controls
3. Reactive maintenance
4. Anticipative maintenance
5. Ascertainment of equipment condition
6. The need for preventive maintenance
7. Why preventive maintenance
8. Preventive Predictive maintenance objectives
9. Preventive Predictive maintenance prerequisites
10. Preventive maintenance feasibility analysis
11. Policies
12. PM program functions
13. Cost impact
14. Saving potential

B. Developing the Preventive Predictive Maintenance Program
1. Assignment of organizational responsibilities typical maintenance functional assignments operational concepts
2. Equipment to be included
3. Equipment inventory sheet – examples
4. Equipment numbering concepts
5. The PM work order
6. Developing the inspection sheet
7. ECS rating sheet as cross reference
8. Sample of equipment components
9. Spare parts and material needs
10. Inspection sheet examples
11. Determining the frequency cycle
12. Frequency cycle examples
13. Scheduled frequency overview
14. Developing job safety practices – typical examples
15. Considering manual versus computerization
16. Predictive maintenance can determine maintenance requirement
17. Predictive maintenance and its applied techniques as part of the PM program
18. Vibration analysis
19. Wear particle analyzing
20. Thermography

C. IMPLEMENTATION OF PREVENTIVE MAINTENANCE PROGRAM
1. Job planning
2. The planning function
3. Planning, Service to do
4. Job planning prerequisite
5. Planners qualifications
6. Duties and responsibilities of planners
7. The hob package
8. Line supervisors qualifications
9. Planning permits Us, to forecast, communicate and measure
10. What job should be planned
11. Time required to perform work…labor content
12. Standard defined
13. Consistency of estimating
14. Estimating methods
15. Work backlog
16. Scheduling of maintenance work
17. PERT and CPM as scheduling tools
18. Loading of the PM work order
19. Load leveling
20. Weekly scheduling
21. Manpower requirements forecasting
22. Forecasting by crew
23. Forecasting by department
24. Weekly schedule – Computer and manual example
25. Training of personne

D. CONTROLLING THE PREVENTIVE PREDICTIVE MAINTENANCE PROCESS
1. Preventive maintenance administration
2. Planned maintenance
3. Special tools and equipment
4. Service user coordination
5. Equipment availability
6. Service user notification – examples
7. Automotive notification – examples
8. Control reporting
9. What should be included
10. Schedule for supervisor
11. Schedule for supervisor service user
12. Overdue for maintenance and service user
13. Missed PM report for maintenance and service user
14. Complete PM’s
15. Summary report of all PM’s completed
16. Listing of all PM’s set-up in program
17. Planning and scheduling index example
18. Assurance of work performed
19. Conformance and auditing
20. Feedback evaluation/corrective action cycle

E. EXAMINING RESULTS
1. Effectiveness of the preventive maintenance program
2. Refining the PM program
3. 3Correlating preventive maintenance to breakdown maintenance
4. Measuring and appraising the PM program
5. Equipment history
6. Analyzing equipment failures
7. Some relevant maintenance control indices
F. APPLICATION EXERCISE
1. How to organize, develop and implement a successful preventive maintenance program summary
2. Adapting the PM concept at your location
3. Hands-on exercise

VENUE : Kagum Group Hotel Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll

TRAINING DURATION : 4 days

TRAINING TIME :

Januari 2024Februari 2024Maret 2024April 2024
2 - 5 Januari 20245 - 8 Februari 20244 - 7 Maret 20241 - 4 April 2024
8 - 11 Januari 202412 - 15 Februari 202412 - 15 Maret 202422 - 25 April 2024
15 - 18 Januari 202419 - 22 Februari 202418 - 21 Maret 202429 April – 2 Mei 2024
22 - 25 Januari 202426 - 29 Februari 202425 - 28 Maret 2024 
29 Jan – 1 Feb 2024   
    
Mei 2024Juni 2024Juli 2024Agustus 2024
6 - 9 Mei 20243 - 6 Juni 20241 - 4 Juli 20245 - 8 Agustus 2024
13 - 16 Mei 202410 - 13 Juni 20248 - 11 Juli 202412 - 15 Agustus 2024
20 - 23 Mei 202419 - 22 Juni 202415 - 18 Juli 202419 - 22 Agustus 2024
27 - 30 Mei 202424 - 27 Juni 202422 - 25 Juli 202426 - 29 Agustus 2024
  29 Juli – 1 Agus 2024 
    
September 2024Oktober 2024November 2024Desember 2024
2 - 5 September 20241 - 4 Oktober 20244 - 7 November 20242 - 5 Desember 2024
9 - 12 September 20247 - 10 Oktober 202411 - 14 November 20249 - 12 Desember 2024
16 - 19 September 202414 - 17 Oktober 202418 - 21 November 202416 - 19 Desember 2024
23 - 26 September 202421 - 24 Oktober 202425 - 28 November 2024 
 28 - 31 Oktober 2024  

INVESTMENT PRICE/PERSON :
1. Rp 8.750.000/person (full fare) or
2. Rp 8.500.000/person (early bird, payment 1 week before training) or
3. Rp 8.250.000/person (if there are 3 or more participants from the same company)

FACILITIES FOR PARTICIPANTS :
1. Training Module
2. Flash Disk contains training material
3. Certificate
4. Stationeries: NoteBook and Ballpoint
5. T-Shirt
6. Backpack
7. Training Photo
8. Training room with Full AC facilities and multimedia
9. Lunch and twice coffeebreak every day of training
10. Qualified Instructor